Skip to main navigation.

Rates

Single-Phase Residential (<100 kva)  
Service Charge $35.00
All kWh $0.1196
Heat Plus  
Service Charge $9.00
All kWh $0.0606
Non-Residential (<100 kva)  
Service Charge $40.00
All kWh $0.1170
Multi-Phase (0-250 kva)  
Service Charge $65.00
Demand $15.62
Energy $0.0485
Large Commercial Single-Phase (<100 kva)  
Service Charge $65.00
Demand $15.10
Energy $0.0604
  • The above rates are based on the size and type of service installed.
  • Wholesale Power Cost Adjustment is applicable to the above rates.
  • Disconnect, Reconnect or Trip Charge - $50 each
  • Overtime Reconnect  -$200

 

Powered by Touchstone Energy Cooperatives Logo